[1]Saul I G,Harris M.Encyclopedia of Operations Research and Management Science [M].Springer US,2001:19-28.[2](美)萨蒂 T L.层次分析法-在资源分配、管理和冲突分析中的应用[M].许树柏,译.北京:煤炭工业出版社,1988:3.
[3]Ranasinghe M,Russel A D.Economic risk analysis of large engineering projects [J].Canadian Journal of Civil Engineering,1991,18(3):416-427.
[4]Mon D L,Cheng C H,Lin J C.Evaluating weapon system by analytical hierarchy process based on entropy weight [J].Fuzzy Sets and Systems,1994,62:127-134.
[5]Skogen S A,Huseby B.Dynamic risk analysis-the dynrisk concept,project management without boundaries [J].Internet,2002(2):511-520.
[6]谢家平.绿色设计评价与优化[M].武汉:中国地质大学出版社,2004:85.
[7]游泳.园林史[M].北京:中国农业科学技术出版社,2002:13.
[8]贾玲利.四川园林发展分期[D].重庆:西南交通大学,2009.
[9]蔡致洁.川西名胜园林形成发展及特色研究[D].重庆:重庆大学,2007.